Avonside Energy

Solar Feasibility Assessment

Created on 12/8/2025
Estimated Commercial Summary
Total Lifetime Saving (25 Years)£0
First Year Savings
-
First Year ROI
-
Annual Carbon
Savings
0 tonnes
Payback Period
-
Installation Cost
£0
Annual Electricity Cost Comparison
£36,000Currentper year
£36,000With Solarper year
£0Annual Savings0% reduction

Protected from electricity price volatility: Your effective electricity rate locked at NaNp/kWh for 25+ years

Your pathway to savings with Avonside

1

Consultation

We will model out the savings you can achieve and talk you through how it works and the different options that will save you money

2

Consideration

We'll give you all the facts and figures and give you a tool to test out and make the decision

3

Activation

When you decide to go ahead we will handle everything from building permits through to installation through to planned maintenance

Success Stories

DFDS Logistics & Shipping

2,107.3 kWp system across multiple UK sites, generating 1,000,000 kWh of renewable electricity

£372,000 first year savings

Supreme Ltd Manufacturing

401.80kWp system completed in under 3 months, achieving ESG targets

£163,000 first year savings

Ardex UK Manufacturing

552.78 kWp system optimizing production facility electricity use

£125,000 first year savings

Horiba MIRA R&D

7071.12 kWp large-scale installation for automotive research leader

£1,000,000 first year savings

Countrywide Healthcare

Medical supplies distributor achieving electricity independence

£85,000 first year savings

DISCLAIMER:

This feasibility assessment provides an estimate based on current data and assumptions. Actual results may vary depending on weather conditions, electricity usage patterns, future electricity prices and other factors. This assessment is not a guarantee of returns or performance. A detailed site survey is required for final system design and accurate projections. Please consult with an Avonside Electricity consultant for a comprehensive evaluation.